|
B-day - the building begins |
|
|
|
|
Written by Ron B
|
|
Friday, 29 September 2006 |
 Contstruction Commences |  Beach as seen from where the pool will be |
Yesterday, September 29, marked the ceremonial commencement of building operations on our Block which is Blok 1B, Jalan Tulip, Temukus. The image on the left shows the architect and helpers driving in stakes and setting up guidelines to mark the location of the house on the block. The coconut palm is likely to remain and be seen popping up through the decking - at least we hope that is how it will turn out. The image on the right looks out over the Bali Sea from where the swimming pool will be.  Buka house now completed |  Buka House upstairs |
These two images show a completed house to the same design that is a few door along on the same street. The left one is a view from on the house, the pool and the bale bengong beside the pool. The picture on the right is from upstairs as the protective sail-cloth is operned to give a clear sea view.
|
|
Last Updated ( Thursday, 18 January 2007 )
|